TAEE3:BVMF
Transmissora Alianca de Enrga Eltrca S/A
13,13 BRL
arrow_upward
+1,16%(+0,15) 1D
6. stu, 11:32:14 GMT -3 · BRL
search
Svi simboli
| Simbol | Cijena | Promjena | Postotna promjena |
|---|
insights_autoGeneriranje najvažnijih uvida za TAEE3...
Otvori
12,98 BRL
Najviša
13,19 BRL
Najniža
12,98 BRL
Trž. kap.
13,92 mlr.
Prosj. kol.
182,81 tis.
Količina
19,30 tis.
P/E omjer
0,93
52-tjed. najviša
15,40 BRL
52-tjed. najniža
12,03 BRL
EPS
14,16 BRL
Dionice u optjecaju
590,71 mil.
Broj djelatnika
867
Otvori
12,98 BRL
Najviša
13,19 BRL
Najniža
12,98 BRL
Trž. kap.
13,92 mlr.
Prosj. kol.
182,81 tis.
Količina
19,30 tis.
P/E omjer
0,93
52-tjed. najviša
15,40 BRL
52-tjed. najniža
12,03 BRL
EPS
14,16 BRL
Dionice u optjecaju
590,71 mil.
Broj djelatnika
867
Vijesti
Iz web-izvora i od partnera za vijesti
Naslovi.net
·
prije 7 sati
Wall Street: Katastrofalan pad indeksa. Strah od usporavanja gradnje podatkovnih centara
Lider Media
·
prije 6 sati
S&P 500 i Nasdaq u velikom padu dan nakon međuizbora u SAD-u
TradingView
·
prije 46 minuta
Algolia Powers Orange with AI Agents for Billing Support: NYSE Content Update
Spectrum News
·
prije 15 minuta
The worldwide sell-off for AI stocks halts, but other U.S. stocks are still struggling
Profil
Taesa is one of the largest Brazilian electric power transmission company. It is majority owned by Belo Horizonte based CEMIG, having the Bogotá based Interconexion Eléctrica as the second largest shareholder.
The company operates approximately 10,000 kilometers of transmission lines in 18 Brazilian states.
Currently, Taesa has 34 transmission concessions, segregated into 10 concessions that make up the holding company; 5 full investees and 19 participations.
The Paraguaçu, Aimorés and Lot 1 concessions are joint ventures with CTEEP - which holds 50% of the capital of each of them.
In addition, it has assets in 67 substations with a voltage level between 230 and 525kV, present in all regions of the country and an Operation and Control Center located in Brasília. Wikipedia
Transmissora Alianca de Enrga Eltrca S/A – informacije
Glavni izvršni direktorMarco Antônio Resende Faria
Zaposlenici867
Osnovano2000
SjedišteRio de Janeiro, Rio de Janeiro, Brazil
SektorUtilities
Djelatnost-
Web-lokacijainstitucional.taesa.com.br